メインコンテンツまでスキップ
Adaptive Insights
Knowledge @ Adaptive Insights LLC, a Workday Company

Google Sheets Example

Google Sheets Example
Provides a Google Sheets example for CCDS

Connecting to Google Drive requires a few preliminary steps:

  • Set the properties of the Google Doc file so it is shared with anyone who has the link.
  • Get the Google Doc ID from the shared link.
  • Update the three instances of the URL value of the Google Doc ID with the one from Google Doc containing the data for your CCDS.  
  • この記事は役に立ちましたか?